Dedicated circuits for the heavy tools, so the lights stop dipping when the saw starts.
The workshop runs off the same two circuits as the rest of the unit. Start the table saw while the compressor is running and the breaker trips, taking the 3D printers down with it mid-print.
A licensed electrician will fit a second distribution board in the workshop with four dedicated 20 A circuits, each on its own breaker with earth-leakage protection, and move the heavy tools onto them.
The work takes two days. We'll do it over a weekend and close the workshop (not the rest of the space) while it happens.
| Distribution board and breakers | S$950 |
|---|---|
| Cable, trunking and sockets | S$700 |
| Licensed electrician, two days | S$1,200 |
| Testing and certificate | S$150 |
| Total | S$3,000 |
Choose a perk, or back it with any amount. Perks are collected at the space.